Lake Muskoka Renovation

Project Overview

Main Floor Renovation: The clients faced devastation when a water leak caused extensive damage to their main level. Seeking a solution, they consulted with Matt to initiate a renovation of the entire main floor. Starting essentially with a blank slate, as the main space was taken back to the studs, gave the clients the opportunity to customize the kitchen space, bathroom, living area, entertainment room, and bedroom.

A black silhouette of a dog sitting.

Build time - 5 months

Black L-shaped ruler with measurement markings on a white background.

Finished sq. ft. - 2,000